
Existing shops given the option to 'opt out' of the new vision

Some choosing to remain relocate to activate a central walkway

Making way for the 'Field' city farm project

Trinity Court and the basement below is utilised for temporary use during London Borough of Culture Celebrations 2023

Section AA

The existing roof is removed to allow for a new open air entrance from the high street

The existing roof is removed to allow for a new open air entrance from the high street

A Library of Things is inserted into the empty Allders department store

Shopping centre atriums are converted into workshops and makerspaces

A portion of the vacant department store is removed to allow for a construction yard

One of the existing carparks becomes a material reuse and salvage depot

A portion of the vacant office block is removed to allow for easier access

Another vacant office block is adapted to house new offices

Whitgift Square roof is removed

And an open air amphitheatre is inserted into the space

A bridge over Wellesley Road is added

Sections of the vacant office blocks are removed

Those spaces become winter gardens within new residential developments

More connecting bridges are added



Stepped access is added

A skatepark is built

The hight street entrance becomes a covered courtyard

Trinity Square becomes an official exhibition hall


Section BB

Section CC

